National Technical Seminar IPWE (India) Use of Modern Retrofitting Techniques in Udaipur Station Building of Agartala Sabroom New Line Project. Presented byB.N. Bhaskar, Dy.CE/Const.-1/Agartala, N. F. Railway (Construction)

LIST OF CONTENTS INTRODUCTION. HISTORY OF PROBLEMS. REMEDIAL MEASURES. STRATEGY FOR RETROFITTING. METHODOLOGY OF RETROFITTING. CONCLUSIONS. INTRODUCTION Udaipur railway station of Agartala-Sabroom New BG Line

Project is situated between Km. 42.2 to 43.3 (Km. 0.00 at Agartala) in the state of Tripura. Station is situated in the Sukhsagar Lake of Udaipur. o Water logged and marshy soil. o Existence of soft soil (Silty Clay) upto 13.3m depth. o Out of 13.3m top 8m is mixed with decomposed trees & wooden logs. During construction of building differential settlement of piles. Retrofitting of the building was done and now the building is functional.

Agartala Udaipur section was opened on 28.09.2016. Location of Udaipur Station Building Sukhsagar Lake Udaipur Station HISTORY OF THE PROBLEM

FORMATION IN STATION YARD: Construction started in Dec 2010. Huge Settlement in the range of 1 to 2m was noticed in Oct' 2011 when construction height reached 3m. The work continued & reached to a height of 5m. Huge Settlement, Cracks and Heaving of adjacent ground beyond toe (upto 25m on both sides of embankment). HISTORY OF THE PROBLEM

STATION BUILDING: Earth filling started in Nov 2011. Pile foundation started in Dec 2011. Pile foundation completed by Nov 2012. Differential settlement observed in Pile cap No. 13, 14 and 35 in May 2012 and cracks noticed in plinth beam and grade beams connected to above mentioned pile caps. Brickwork for wall done in Jan 2014 and differential

settlement increased further. REMEDIAL MEASURES Ground soil improvement of the adjoining area by Pre-fabricated Vertical Drain (PVD) for accelerating consolidation of soft soil. Sheet piling of adequate retaining capacity around the station building before stripping off the existing surrounding embankment for PVD installation. Retrofitting of the station building by providing

additional pile raft system and Carbon Fibre Reinforced Polymer (CFRP). STRATEGY FOR RETROFITTING 1) Addition of structures Additional piles in each room and near to failed piles. Provision of suspended slab. 2) Withdrawal of filled up soil between plinth beam and pile cap 3) Strengthening of structures by using Carbon Fibre

Reinforced Polymer. Grade beam Plinth beam Columns METHODOLOGY OF RETROFITTING ADDITION OF PILES Installation of Additional two number of cast in situ 600mm dia RCC piles of 25m length in each room. In case of differential settlement of piles, major portion of

the load will be transferred to these piles through the new beam connecting existing plinth beam and new pile cap. METHODOLOGY OF RETROFITTING INSTALLATION OF 600MM RCC PILES AND MAKING OF PILE CAP METHODOLOGY OF RETROFITTING CONNECTING THE NEW PILE CAP WITH THE EXISTING PLINTH BEAMS BY NEW BEAMS TO TRANSFER THE LOAD TO THE NEW PILES

METHODOLOGY OF RETROFITTING ADDITION OF SUSPENDED SLAB Introducing new structural slab, integrated with plinth beams, columns and new pile cap. This slab would behave as suspended slab as the filled soil is removed. (Gap between suspended slab and finish ground level is reducing the overburden load and may be used for services.). Integrating suspended slab with plinth beam in such a way that it acts as a single entity.

METHODOLOGY OF RETROFITTING ADDITIONAL REINFORCEMENT FOR PLINTH BEAM CONNECTING SUSPENDED SLAB WITH PLINTH BEAM AND COLUMNS METHODOLOGY OF RETROFITTING REINFORCEMENT READY FOR SUSPENDED SLAB CASTING

METHODOLOGY OF RETROFITTING STRENGTHENING OF GRADE BEAM, PLINTH BEAM AND COLUMNS: Grade Beams by Carbon Fibre wrapping. Plinth Beams by fixing the Carbon Laminate and by Carbon Fibre

wrapping. Columns by Carbon Fibre wrapping METHODOLOGY OF RETROFITTING GRINDING OF GRADE BEAM AND PLINTH BEAM To smoothen the concrete surface Plinth Beam

Grade Beam METHODOLOGY OF RETROFITTING APPLICATION OF POLYMER MODIFIED MORTAR (PMM) TO THE BOTTOM OF PLINTH BEAMS As a leveling course to make good the undulations in the bottom of beams. METHODOLOGY OF RETROFITTING

GROUTING OF CRACKS WITH MONOPOL CHEMICAL To fill the cracks (Grouting pressure: 3-5 Kg/cm2) Fixing of Nozzle Monopole Chemical Grouting Machine METHODOLOGY OF RETROFITTING

APPLICATION OF PRIMER COAT OVER THE BEAM SURFACE To fill the surface voids RESIN PRIMER APPLICATION APPLICATION OF PUTTY As leveling course PUTTY APPLICATION

METHODOLOGY OF RETROFITTING CARBON FIBRE LAMINATE : MECHANICAL PROPERTIES: PHYSICAL PROPERTIES: Materials- Carbon-80%, Laminate Tensile Strength 1800 Mpa Resin-20%, Laminate Tensile Elastic Density-1.6 gm/cc Modulus-150 GPa

Laminate width-100 mm and Thickness-2.4 mm METHODOLOGY OF RETROFITTING Fixing of carbon laminate to the plinth beams in 80% length Fixing of Laminate to the Plinth Beam bottom FIXING OF ANCHOR PLATE

To provide firm fixidity of Laminate with plinth beam bottom Fixing of Anchor plate to Plinth beam METHODOLOGY OF RETROFITTING CARBON FIBRE Physical Properties: Materials: Carbon content -99%,

Thermo glass yarn -1% Carbon Fibre wrap width-500 mm Carbon Fibre Thickness - 0.44 mm Mechanical Properties: Carbon Fibre Tensile Strength 4100 Mpa Carbon Fibre Tensile

Modulus - 250 GPa METHODOLOGY OF RETROFITTING CARBON FIBRE WRAPPING OF THE GRADE BEAM, PLINTH BEAM AND COLUMN Confines the concrete Enhances compressive strength of concrete. Improves shear strength of concrete. Improves ductility of structural elements . Arrests the crack propagation in the beams.

METHODOLOGY OF RETROFITTING CARBON FIBRE WRAPPING METHODOLOGY OF RETROFITTING FIXING OF CARBON FIBRE ANCHOR To have intact bond between beam and carbon fibre (Spacing 300mm c/c) Carbon Fibre Anchor

SECOND COAT OF EPOXY OVER THE CARBON FIBER WRAPPING To protect from weathering action CONCLUSIONS Initially when construction was carried out, the condition of soil was poor and initial consolidation settlement caused distress. Piling and filling of soil work were done

simultaneously which resulted into negative skin friction. Retrofitting of station building aimed at deriving the adequate lateral capacity for earthquake resistance and to strengthen for the applicable loads, forces and effects. The creation of strong diaphragm by structural slab and beams along with additional Piles/ Pile Cap also helped in arresting differential settlement.

The retrofitting of station building includes the state of art techniques by using CFRP wrap, Carbon Fiber Anchors, Carbon Laminates etc, for strengthening Grade Beams, Columns, Plinth beams which makes the system very strong and durable. Overall, following capacities were enhanced by doing retrofitting. Shear capacity. Flexural capacity of beam. Load bearing capacity of Columns and Foundations.

Ductility and Seismic capacity. THANK YOU

Recently Viewed Presentations

  • types of sentences

    types of sentences

    An idea (like a proper sentence with someone doing something) and some information that can't stand alone (it isn't a sentence by itself) This is an INDEPENDENT clause (a complete sentence - can stand on its own) and a DEPENDENT...
  • Preservation and storage management for Institutional ...

    Preservation and storage management for Institutional ...

    Preservation and storage management for Institutional Repositories RSP Summer School 2008, Session 3 Maureen Pennock Steve Hitchcock Digital Preservation Aims of this session: Show why preservation matters Encourage you to engage with preservation planning Introduce you to some tools and...
  • Basic Training Scenario Mobile Phone Insurance Mobile Phone

    Basic Training Scenario Mobile Phone Insurance Mobile Phone

    Instead of pricing, marketing may be attracting the lower than average risks. Educator Notes: This final questions asks students to think critically about adverse selection, segmented pricing, and the insurance company business at large. Students should be able to identify...
  • Incoming Energy Notes

    Incoming Energy Notes

    Other factors: Specific Heat of Materials = the quantity of heat needed to raise the temp of 1 gram of a substance by 1° C. = the resistance of a material to heating or cooling. High specific heat means it...
  • IHCDA LEAD BASED PAINT TECHNICAL ASSISTANCE WEBINAR FEBRUARY

    IHCDA LEAD BASED PAINT TECHNICAL ASSISTANCE WEBINAR FEBRUARY

    Chapter 5 of HUD's Guidelines for the Evaluation & Control of Lead-based Paint Hazard in Housing recommend that risk assessors select a minimum of four rooms for dust sampling (except, of course, when the dwelling unit has less than four...
  • Visualization and alerting with RRD, Nagios XI, and

    Visualization and alerting with RRD, Nagios XI, and

    If there are multiple operations, the operator is given immediately after its second operand; so the expression written "3 − 4 + 5" in conventional notation would be written "3 4 − 5 +" in RPN: 4 is first subtracted...
  • DMAIC: Measure

    DMAIC: Measure

    DMAIC: Measure Robert Setaputra Measure The measure phase begins with the identification of the key process metrics. Once the key process metrics have been specified, related process and customer data is collected.
  • Recording Clinical Data Richard Oliver Head of Information

    Recording Clinical Data Richard Oliver Head of Information

    Caldicott - protection of PID in health service. May allow us to access data but agreement generally not to share with any third party! Key Point. Know what you are allowed to do. REC application / protocol. Patient information sheets...