PG&E Presentation Template - IBEW Local 1245

PG&E Presentation Template - IBEW Local 1245

Gas Operations Line of Progression Update General Construction Gas Department October, 2014 Overview of the New Lines of Progression Background New Agreement Whats Changed Implementation Q&A

Resources What are the Lines of Progression? Lines of progression are the career paths that employees can choose to take. The last time we did a broad look at our lines of progression was nearly 50 years ago. As you can imagine, a lot of things have changed since then. Many of our existing line of progressions dont reflect todays job duties, processes, technology, training requirements and tools. Agreements are the result of nearly 2 years of collaboration between IBEW and PG&E . 4 Workgroups and Classifications

Gas Field Service Gas T&D Pipeline Operations & Maintenance Maintenance (including I&R) Transmission Pipeline Clearances Operations (TPCO) LNG/CNG Operations Transmission Gas Systems Operations Station Operations Gas Transmission & Distribution Operations (T200) Corrosion Compliance Construction and Equipment Welding/Crew Foreman General Construction Gas (T300) Construction and Equipment Welder Inspection Tapping

Overview of the New Lines of Progression General Construction Gas Department Highlights of New LOPs Create career paths, allowing employees to develop their expertise in a focused area. Consolidate classifications and remove outdated classifications. Standardize training and operator qualifications (OQs for each classification, maximizing training effectiveness and removing unnecessary training). Create internal inspector workforce. Establish joint committees to: Address transitional and staffing issues Continue discussions of job definitions Develop training programs and entrance exams Discuss lead classifications 6 New Classifications

Pipeline Inspector with CWI The Pipeline Inspector is qualified Company representative who may perform all of the duties of the Inspector and Utility Inspector. Provide direct oversight of transmission and larger or more complex distribution construction projects involving steel or plastic pipe. Construction Inspector The Inspector is a qualified Company representative who performs direct oversight of all Applicant or Contractor installed facilities. This includes distribution steel pipeline coating projects, complex projects, large commercial, industrial and major residential projects, distribution line extensions, service extensions, and replacement of overhead with underground electric facilities. May be assigned to inspect coating on transmission pipeline projects. Utility Construction Inspector The Utility Inspector is a qualified Company representative who performs direct oversight of

Applicant or Contractor installed facilities limited to plastic distribution systems and smaller underground projects. Future Lead Inspector Classifications Lead Pipeline Inspector CWI and Lead Inspector Oversight Committee will continue to discuss these Details on requirements and training are listed in LA14-39 and on LOP Intranet and IBEW 1245 Consolidated Classifications Senior Gas Construction Operator Combines Tractor Operator, Driller, Trencher Operator, AND Crane Operator GC Gas In addition, this classification will include operation of Directional Boring and other Drilling Equipment and operation of Tractor End-Dump Equipment. This classification remains equal to the Backhoe Operator and will be next higher to the newly created Gas Construction Operator.

Gas Construction Operator Combines MEO GC Gas AND Fieldperson GC Gas This consolidated classification will have a seven step wage progression beginning with the current start step of Fieldperson and ending with the current top step of MEO. Fieldperson MEO Crane Operator Tractor Operator Trencher Operator Driller Construction Operator Sr Construction Operator Temporary Upgrade Time for Consolidated Classifications

Consistent with the intent of Subsection 304.1(b), employees who have been temporarily upgraded in the past will be given credit for all such upgrades when promoted (or combined), based on the wage rate previously earned in such classifications. Present Incumbent Only Classifications (PIO) Working Foreman C (PIO) Will remain next lower to working Foreman B, also eligible for the new Inspector classifications Drilling Working Foreman C (PIO) Designated as PIO in 2005 Gas Mechanic (PIO) Classification is within GC M&C Obsoleted Classifications GC Installer No incumbents.

Carpenter B GC Gas Carpenter B - Gas employees will be placed in the retitled Carpenter Gas classification. Trencher Operator GC Gas No incumbents. Driller Incumbent placed into the new Sr construction OperatorGC classification Tapping Technician Joint Committee to develop a Tapping Technician Training program Employees who hold the classification of a Welder GC Gas or Welder GC Gas (In-Service) Welder will continue to maintain Section 305.5 preferential consideration to the Tapping Technician classification In the event Welder GC Gas or Welder GC Gas (In-Service) employees decline the promotion to a Tapping Technician vacancy the parties agree to provide promotional opportunities to internal GC Gas employees in the

following classifications: Senior Construction Operator GC Gas Backhoe Operator Construction Operator - GC Gas Note: Exhibit II General Construction Promotion-Demotion Geographic Areas identify Gas Construction Technical Classifications as Area 8 (Promotion Demotion Area System-Wide). Next Lower/Eligible Tables Inspection INSPECTION LINE OF PROGRESSION Classification Pipeline Inspector CWI Next Lower/Eligible Classifications Construction Inspector Working Foreman A Working Foreman B Working Foreman C Gas (PIO) Welder GC Gas (In-Service)

Welder GC Gas Classification Construction Inspector Next Lower/Eligible Classifications Utility Construction Inspector Working Foreman A Working Foreman B Working Foreman C Gas (PIO) Welder GC Gas (In-Service) Welder GC Gas Utility Construction Inspector Construction Operator GC Gas Next Lower/Eligible Tables Construction Classification Working Foreman A

Next Lower/Eligible Classifications Working Foreman B Working Foreman B Working Foreman C (PIO) Backhoe Operator Senior Construction Operator- GC Gas Welder GC Gas (In-Service) Welder GC Gas Pipeline Inspector CWI [1]Inspector [1] Construction Operator GC Gas Carpenter Street Fitter Backhoe Operator Senior Construction Operator GC Gas Carpenter

Construction Operator GC Gas Carpenter Street Fitter Construction Operator GC Gas Street Fitter Construction Operator GC Gas Construction Operator GC Gas Utility Worker [1] To be considered qualified must have previously held Working Foreman C (PIO), Backhoe Operator, Senior Construction Operator GC Gas, Welder GC Gas (In-Service), Welder GC Gas, Working Foreman B, Working Foreman A Next Lower/Eligible Tables Welding WELDING LINE OF PROGRESSION Classification Tapping Technician

Welder GC Gas (In-Service) Welder GC Gas Apprentice Welder GC Gas Next Lower/Eligible Classifications Welder GC Gas (In-Service) Welder GC Gas Backhoe Operator [2] Senior Construction Operator GC Gas [2] Construction Operator GC Gas [2] Apprentice Welder GC Gas Construction Operator GC Gas Utility Worker [2] Eligible in the event Welder GC Gas (In-Service) or Welder GC Gas decline promotion to Tapping Technician LOP Illustration G.C. GAS LINE OF PROGRESSION CHART TECHNICAL

CREW LEADER A 0644/50010176 TAPPING TECHNICIAN 0261/50258203 TECHNICIAL CREW LEADER B 0645/50010177 PIPELINE INSPECTOR CWI XXXX/51665127 GAS TECHNICIAN 2413/50010416 CONSTRUCTION INSPECTOR XXXX/51665126

APPRENTICE GAS TECHNICIAN 2412/50010415 UTILITY CONSTRUCTION INSPECTOR XXXX/51664850 WORKING FOREMAN A 0257/50251366 WELDER IN-SERVICE 2599/50491923 WELDER 2617/50010435 APPRENTICE

WLEDER 2628/50010438 WORKING FOREMAN B 0255/50251368 BACKHOE OPERATOR 1515/50010305 SENIOR CONSTRUCTION OPERATOR-GC GAS XXXX/51664846 CARPENTER 0163/50010096 STREET FITTER 0580/50010171

CONSTRUCTION OPERATOR-GC GAS XXXX/51664847 UTILITY WORKER 0947/50010223 Pursuant to L/A 12-32, employees may be required to have or obtain a Class A Drivers license. For illustrative purposes only. PIO classifications not shown. For clarification see Attachment 3, GENERAL CONSTRUCTION CLASSIFICATIONS CONSIDERED AS NEXT LOWER/ELIGIBLE BASED ON SENIORITY Implementation 17 GC Gas Joint Oversight Committee George Unsworth Mike Robertson Steve Lange

Don Hendrix Mike Frasu Mark Rolow JV Macor Casey Barker *Previously established under the direction of the JATC. Rick White Jerry Rice Joel Mannie Ron Huggins John Fiske Jodeane Fischer Greg Cocard Next Steps

Company to combine/consolidate classifications, as applicable Wage adjustments, as applicable Employees update TP sheets for new classifications Vacancies to be filled Create new bid codes and post in promo-demo areas (305.7i) Employees submit bids Training will be developed and reviewed with Oversight Committee and JATC More information will be distributed Resources/Contacts IBEW Page IBEW1245.com/pge Mark Rolow JV Macor

Casey Barker PG&E LOP Intranet http://pgeweb/gas/lop/Pages/ Gaslops.aspx Rick White Jerry Rice Jodeane Fischer Email questions to [email protected] Questions?

Recently Viewed Presentations

  • POLITICAL ISLAMISM IN TUNISIA: a History of Repression and a ...

    POLITICAL ISLAMISM IN TUNISIA: a History of Repression and a ...

    The Spectrum of Political Islamism . Within Tunisia true diversity within political Islamism exists. While some followers, such as Salafists, may hold puritanical views that date back to the practices of early historical Muslims, others support the idea of a...
  • عرض تقديمي في PowerPoint

    عرض تقديمي في PowerPoint

    There is hypothesis which suggests that innate signaling through toll pathways may be a mechanism for activating anergic B cells that are unresponsive to signaling via BCR cross-linking. Triggers for Autoimmunity.
  • Single Loop Questions

    Single Loop Questions

    Single Loop Questions. Do we have a budget? Have you been to visit the ECE places or visited other schools? Who has done this transition? Do you not like the way it is now?
  • Epistle To The Philippians The Attitude Adjustment Reminder

    Epistle To The Philippians The Attitude Adjustment Reminder

    For this reason also, God highly exalted Him, and bestowed on Him the name which is above every name, so that at the name of Jesus every knee will bow, of those who are in heaven and on earth and...
  • Solubility - Mr. Hoover's Science Classes

    Solubility - Mr. Hoover's Science Classes

    Solubility Categories (P 323) High Solubility - with a maximum concentration at SATP (standard ambient temperature and pressure) of greater than or equal to 0.1 mol/L . Low Solubility - with a maximum concentration of SATP of less than 0.1...
  • Title as in notes

    Title as in notes

    Tricks of the trade Some birds, a cool cat and a wolf Dick Wiggins, City University, London Gopal Netuveli, Imperial College, University of London
  • LANGUAG E ?How can any language be divided

    LANGUAG E ?How can any language be divided

    The silly man laughed uncontrollably. The boy said he was sorry. The drunk gentleman wasn't sure if the clock was fast or slow. 1) The fire spread rapidly. 2) Astronauts are really cool. ... He carried the bowl of soup...
  • Epic Basic Appointment Scheduling

    Epic Basic Appointment Scheduling

    Epic's referral functionality tracks the number of appointments scheduled and completed relative to an assigned referral in order to prevent you from associating more contacts with a referral than have been authorized.